Access the Full Project by Clicking here!
Bidjugde
JOB
2026 Pavement Overlay Curb Ramp Broadway
BID DATE
03/4/26 - 12:00
AGENCY
Redwood City
ESTIMATE
$3
SCOPE
The work of this project consists generally of, without limitation, notification of residents, traffic control, BMP, storm drain, and manhole installation, traffic signal, streetlight, and detector loops, installation, concrete curb ramp, curb and gutter, and sidewalk installation, street asphalt concrete spot reconstruction, asphalt concrete area grind and pave, resurfacing City streets with HMA overlay, adjust utilities lid to the new grade, installation of new markings and permanent striping, and site cleanup. https://www.redwoodcity.org/Home/Components/RFP/RFP/2077/2322 jaime.rodriguez@redwoodcity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT