JOB
CIP 2305 Parris Island PI 16 Inch Steel Water Transmission Main Replacement Malecon Drive
BID DATE
03/4/26 - 12:00
AGENCY
Beaufort Jasper Water Sewer Authority
ESTIMATE
n/a
SCOPE
Phase I: Installation of approximately 12,200 linear feet of 16-inch Polyethylene liner inside of an existing 16-inch steel waterline and other related required for complete installation. Phase II: Installation of approximately 1,625 linear feet of 16-inch fusible PVC installed by horizontal directional drill (HDD) on both sides of Archer Creek Bridge to replace and existing 16-inch waterlines suspended from the Bridge and 170 linear feet of 16-inch PVC installed by open cut. https://bjwsa.bonfirehub.com/opportunities/219227