Access the Full Project by Clicking here!
Bidjugde
JOB
Lenoir Fire Department Infrastructure Repair
BID DATE
03/5/26 - 12:00
AGENCY
Lenoir
ESTIMATE
n/a
SCOPE
The project will replace and re-align approximately 420 linear feet of 42-inch corrugated metal pipe (CMP) with 42” Reinforced concrete pipe (RCP) along with 5 drainage structures. Over the last several years, a sinkhole has appeared in the greenspace between the fire department and Ridge Street NW above the 42-inch CMP pipe system. The CMP storm drainage system from West Avenue NW to Ridge Street NW is in a state of failure. This project will abandon approximately 210 linear feet of existing 42-inch CMP and 265 linear feet of 8” sanitary sewer pipe. Soil grout and miscellaneous grading will be required to repair the sinkhole. Foundation protection will be installed on the north side of the fire department building. The existing storm drainage and sanitary sewer systems are 25 ft and 30 ft deep, respectively, and special consideration will need to be taken to provide sheeting/shoring during construction. https://www.cityoflenoir.com/bids.aspx?bidID=38 lhartley@ci.lenoir.nc.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT