Access the Full Project by Clicking here!
Bidjugde
JOB
Red Bluff Terrace Drainage Improvements Phase 1
BID DATE
03/2/26 - 2:00
AGENCY
Pasadena
ESTIMATE
n/a
SCOPE
This project includes installation of new storm sewer and waterline improvements along Marshall, Norman, and Raymond Streets from Bearle Street to Alastair Street. Existing waterlines will be abandoned in place and replaced with new 8-inch waterlines with hydrants, valves, and service connections, tied into the existing system at Bearle and Alastair. The work also includes pavement, curb, sidewalk, ADA ramp, and landscaping restoration, as well as traffic control to maintain at least one open lane during construction and two lanes when work is not active. https://www.civcastusa.com/project/697bd2f09f683227a0f8c154/summary luis.barco@hrgreen.com
PREBID
2/17/2026 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT