Access the Full Project by Clicking here!
Bidjugde
JOB
Lake Tristan Dam
BID DATE
02/26/26 - 8:00
AGENCY
Ivanhoe
ESTIMATE
n/a
SCOPE
-Mobilization -Traffic Control - barricades, signs, traffic detours, etc. -SW3P - preparation, maintenance, and removal -Construction Materials Testing -Prepare Right-of-Way -Design & Installation of Temporary Special Shoring and associated Dewatering -Removal of Existing Asphalt Road Paving and Base -Proof Rolling -Embankment/Placement of Structural Fills -Excavate for Proposed Concrete Structures (box culverts and associated paving) -Construct new Secondary Spillway consisting of thirty-two (32) 10’ x 5’ cast-in-place box culverts -Construct Proposed Concrete Lined Outfall Ditch -Construct Proposed Reinforced Concrete Riprap -Install Proposed Articulated Concrete Revetment Matting -Demo and Remove Existing Secondary Service Spillway -Construct Asphalt Road, Guardrail, and Striping -Permanent Seeding https://www.civcastusa.com/project/697ad29f0b4e4b7d9697f758/summary wcarpenter@lja.com
PREBID
2/9/2026 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT