Access the Full Project by Clicking here!
Bidjugde
JOB
SU010 Detention 1100 N Storm
BID DATE
02/19/26 - 12:00
AGENCY
Ogden
ESTIMATE
n/a
SCOPE
Install detention pond weir structures, excavate, regrade, and seed bottom of detention pond, install low flow channel with erosion matting, install 36" Storm Outfall, 1,515 linear feet of RCP, 12 manholes, 10 catch basins, two 8" water main loops, and replacing some water service laterals. https://www.ogdencity.gov/264/Purchasing Purchasing@ogdencity.com
PREBID
2/11/2026 9:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT