Access the Full Project by Clicking here!
Bidjugde
JOB
Tangerine Downtown Sewer Conveyance System – Phase I
BID DATE
11/5/15 - 2:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
PLANHOLDERS LIST UPDATED. The work under this contract shall consist of furnishing all labor, equipment, and materials required to construct 15-inch and 18-inch gravity sanitary sewer mains in order to connect the existing gravity sanitary sewer main constructed along Rillito Village Trail to the existing sanitary sewer main located on West Clark Farms Boulevard east of West Despain Drive. The work includes, but is not necessarily limited to pipe installation; manhole installation; trenching, backfill, and grading; construction of gravel surfaced maintenance road; removal and replacement of asphalt pavement, concrete curbs and flatwork, and agricultural irrigation system facilities; site restoration, traffic control, quality control, and other related incidental work as shown on the associated plans and/or described in the specifications.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT