Access the Full Project by Clicking here!
Bidjugde
JOB
Coleman Park Improvements Phase I
BID DATE
02/17/26 - 12:00
AGENCY
Morro Bay
ESTIMATE
n/a
SCOPE
The work shall include, but is not limited to, providing all tools, materials, labor, equipment, and incidentals necessary for the successful site grading and construction of an ADA concrete paved parking stall, concrete pedestrian walk ways, flatwork, and sidewalks, installation of water and sewer services, surface/subsurface drainage appurtenances, preparation of pad foundation for installation of a new prefabricated restroom building to be installed by the restroom manufacturer, installation of a play equipment area and surfacing, concrete seat walls, and related ADA improvements and associated improvements for the successful construction of the Project. All utilities not replaced will be protected in place including manholes and returned to their prior condition. The work will also include any required traffic control, signage, public notifications, stormwater control, shoring, formwork, and all other work necessary to render the infrastructure/facility complete and operational. https://www.morrobayca.gov/bids.aspx?bidID=140 nstong@morrobayca.gov
UPDATES