Access the Full Project by Clicking here!
Bidjugde
JOB
Eastside Neighborhood JPL Connector Trail Improvements
BID DATE
11/4/15 - 2:00
AGENCY
Pasadena
ESTIMATE
$75,000
SCOPE
Demolition shall include clearing of existing non-native grass, weed growth, rubbish, soil and debris along the edge of trails. The construction work to be performed includes trail repair with decomposed granite; installation of cobble swale, signage, chain line fencing, railroad ties, crushed stone with filter fabric and mulch. Work to be performed shall include, but is not limited to: provide all labor, materials, methods, processes, tools, implements, machinery and transportation, temporary power which are necessary and required to complete the project as described in the Construction Plans and the Standard Specifications, except as modified and supplemented below, as directed by the Engineer, and as herein specified. Jeff Kuhn - 626-744-7389 jkuhn@cityofpasadena.net

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT