Water Interconnection Ridgeville Phase 2B
BID DATE
02/26/26 - 12:00
AGENCY
Dorchester County SC
ESTIMATE
n/a
SCOPE
Project shall include the furnishing of all labor, materials, and equipment required to install approximately 27,000 linear feet (LF) of new 16-inch water main via mostly open-cut, along with one (1) jack and bore operation and five (5) horizontal directional drill operations; approximately 10 LF of 12-inch water main; (32) 16 DIRJ gate valves; (1) 12 DIRJ gate valve; (22) fire hydrant assemblies; (8) air release valves; and (79) new water service lines; associated appurtenances; surface restoration; and other all incidentals, as detailed in the Contract Documents and as specified herein. RDantzler@DorchesterCountySC.gov https://procurement.opengov.com/portal/dorchestercountysc/projects/231209