Access the Full Project by Clicking here!
Bidjugde
JOB
Highland Village Stormwater Improvements Phase 1
BID DATE
02/6/26 - 3:00
AGENCY
North Miami Beach
ESTIMATE
n/a
SCOPE
Project work includes furnishing all materials, labor, and equipment necessary to install backflow prevention devices upstream of the existing outfalls located adjacent to NE 25th Avenue, including, but not limited to, excavation, demolition; installation of proposed drainage structures; connection to existing storm drain system HDPE Storm Sewer (sizes vary), sleeves (sizes vary) and inline backflow prevention device; remove and relocate as required: existing 2” water services; relocate existing 8” watermain; replacement of any sod, sidewalk, pavement damaged during construction, and other appurtenant and miscellaneous items for a complete, satisfactory and functional installation. https://procurement.opengov.com/portal/citynmb/projects/232158

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT