Access the Full Project by Clicking here!
Bidjugde
JOB
Somerton Pavement Preservation
BID DATE
02/11/26 - 9:00
AGENCY
Somerton
ESTIMATE
n/a
SCOPE
The work includes mechanical cleaning and sweeping of existing pavement; localized patching or leveling and milling at tie-in locations; application of an even and continuous tack coat; placement and compaction of a 2-inch hot mix asphalt overlay using a City-approved mix design; construction of clean and properly sealed pavement joints; re-striping following asphalt curing in accordance with plans provided by the Public Works Department and MUTCD requirements; provision and maintenance of all required traffic control; final cleanup of all construction debris and disturbed areas; and participation in a final inspection by the City for acceptance. The work will be completed at County 15th Street from Somerton Avenue to Cesar Chavez Avenue, consisting of approximately 113,495 square feet of existing roadway surface, and at Marshall Loop Court, consisting of approximately 13,437 square feet of existing roadway surface. roseanadouglas@somertonaz.gov and alejandrocamacho@somertonaz.gov
PREBID
1/28/2026 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT