Access the Full Project by Clicking here!
Bidjugde
JOB
Tin Top Road Drainage Improvements
BID DATE
02/17/26 - 12:00
AGENCY
Weatherford
ESTIMATE
n/a
SCOPE
The project generally consists of the installation of a new storm drain system to address significant ongoing soil erosion occurring within an aging and deteriorating open drainage ditch. The existing ditch, which currently lacks structural integrity, poses a long-term risk to the adjacent roadway due to progressive erosion. The proposed improvements include replacing the failing ditch with an underground storm drain pipe, topped with a minimal surface channel for limited overland flow. This project will also include a grouted rock lined channel. https://www.civcastusa.com/project/696910492356daa9590ba0cf/summary Colton.Sizemore@shield-engineering.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT