Access the Full Project by Clicking here!
Bidjugde
JOB
FY26 Sewer Main Relining
BID DATE
02/5/26 - 12:30
AGENCY
Rocky Mount
ESTIMATE
n/a
SCOPE
The reconstruction of pipelines and conduits by the installation of a resin-impregnated flexible tube, which is tightly formed to the original conduit. The resin is cured using either hot water under hydrostatic pressure or steam pressure within the tube. The Cured-In-Place Pipe (CIPP) will be continuous and tight-fitting. class='bg_grey' href='https://evp.nc.gov/solicitations/details/?id=8aa35323-16f6-f011-8407-001dd80db495' target='_blank'>https://evp.nc.gov/solicitations/details/?id=8aa35323-16f6-f011-8407-001dd80db495 tracy.winfield@rockymountnc.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT