Rampart Delivery System Expansion Phase 1A
BID DATE
03/5/26 - 2:00
AGENCY
Aurora
ESTIMATE
n/a
SCOPE
The RDS currently consists of two large diameter pipes – a 42/40-inch diameter pipeline that was installed circa 1957, and a 54-inch diameter pipeline that was constructed circa 1978 – that convey raw water from the Rampart Reservoir to the City’s water purification facilities. A phased plan to add a third pipeline has been developed by the City. The first segment of the RDS Expansion, Phase 1A, extends the third pipeline from the Rampart Reservoir Outlet Works to existing Intertie 1, east of Hwy 85 at the south edge of Highlands Ranch, and will increase the RDS system capacity to approximately 81 MGD. https://www.bidnetdirect.com/colorado/solicitations/open-bids/Rampart-Delivery-System-Expansion-Phase-1A/0000410201?purchasingGroupId=8409951&origin=2 njones@auroragov.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT