projects bidding

Access the Full Project by Clicking here!
Bidjugde
JOB
Swift Trail
BID DATE
09/15/11 - 1:00 LIVE! REAL-TIME
AGENCY
United States Department of Transportation
ESTIMATE
$2,000,000
SCOPE
AZ 34-1(3) Swift Trail consists of reconstructing two locations on State Route 366 (SR 366), Swift Trail. SR 366 is located within Coronado National Forest approximately 7 miles southwest of Swift Trail Junction, Arizona. The project consists of spot improvements at two locations, Noon Creek and Wet Canyon, including realignment, concrete box beam bridge construction, concrete retaining walls, and drainage and parking lot improvements. Work at the Noon Creek site includes 500 cuyd of embankment construction, 48 lnft of 20' span x 7' rise concrete arch culvert, 500 tons of roadway aggregate, 300 tons of hot asphalt concrete pavement, and associated traffic control, erosion control, and surveying and staking. Contractor will need to perform design for culvert structure at Noon Creek, including foundation requirements. Work at the Wet Canyon site includes 600 cuyd of embankment construction, 92 feet of reinforced concrete retaining wall, 184 cuyd of structural concrete, 100,000 lbs of reinforcing steel, 155 lnft of drilled shafts, 150 lnft of concrete curb, 450 tons of aggregate base, 300 tons of hot asphalt concrete pavement, and associated traffic control, erosion control, and surveying and staking. There will be road closures planned for bridge girder setting & drilled shaft construction at Wet canyon and the contractor will need to work closely with ADOT on co-ordination.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT