7th Street Sliplining
BID DATE
02/25/26 - 1:00
AGENCY
Bullhead
ESTIMATE
n/a
SCOPE
This project consists of sliplining two sections of 24-inch sanitary sewer main, and the rehabilitation of three (3) 60-inch manholes near the intersection of Highway 95 and 7th Street in Bullhead City, Az. This sewer main carries approximately 0.46 million gallons per day (MGD) with a peak wet weather flow of 0.91 MGD. Bypass pumping or other approved methods of flow control are required throughout the duration of this project. In preparation for sliplining the pipelines, heavy cleaning consisting of jet rodding, descaling, bucket cleaning and/or other methods may be required. jrenfroe@bullheadcityaz.gov rfarnell@bullheadcityaz.gov