SCOPE
This project consists of approximately 3,300 linear feet of 8-inch and 270 linear feet of 12-inch water main through the town of Kingsbury. The project includes several right-of-way crossings to be installed per Guadalupe County and Texas Department of Transportation (TxDOT) utility installation requirements. Approximately 200 feet of pipe will be installed across Union Pacific Railroad (UPRR) property. Other project components include gate valves, fire hydrants, air release valves, tie-ins to existing water mains and reconnecting water meters. https://www.civcastusa.com/project/694e98914f43cdfb86651d6d/summary cparker@msengr.com