Access the Full Project by Clicking here!
Bidjugde
JOB
2623ITB Lift Station 62 Replacement
BID DATE
02/24/26 - 12:00
AGENCY
Daytona Beach
ESTIMATE
n/a
SCOPE
This project involves replacing Master Wastewater Lift Station 62, located on a City-owned parcel in Daytona Beach. A new submersible pump station will be constructed, and the existing lift station, including its structure, will be demolished. Work will be completed in phases as shown in the Drawings, with the existing lift station remaining operational until the new station is constructed and commissioned. Additional demolition activities will be undertaken to remove existing ancillary structures located on-site that are no longer required for operation. The new pump station will feature a 16-foot inner diameter circular wet well, installed using a sunken caisson or an approved equivalent excavation method. The station will be equipped with three (3) submersible duty pumps and one (1) standby pump, all operated via variable frequency drives (VFDs), as well as a submersible mixer for improved wet well performance. https://procurement.opengov.com/portal/codb/projects/221685 purchasing@daytonabeach.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT