Access the Full Project by Clicking here!
Bidjugde
JOB
Oro Valley Community Center Parking Lot Resurfacing
BID DATE
02/12/26 - 11:30 LIVE!
AGENCY
Oro Valley
ESTIMATE
$1,000,000
SCOPE
Work includes providing all required traffic control (note Traffic Control is Lump Sum), safety measures, and SWPPP compliance; removing and reinstalling wheel stops; removing existing extruded curb and replacing it in the same location with Class 3000 concrete with contraction joints at 10-foot intervals; saw-cutting asphalt; disposing of all demolition materials off-site; repairing or replacing base material as needed; regrading landscape islands. Pavement work includes removing 4 inches of existing asphalt pavement, placing 1.5 inches aggregate base course (ABC) and 2.5 inches of asphalt concrete pavement (AC) PAG - Mix No. 2, and performing all required testing per the latest PAG Specifications. The contractor will need to have the existing sub-base tested and provide density tests, and restripe the parking area to match the existing layout, including ADA-compliant stalls, van-accessible spaces, access aisles, directional arrows, symbols, and installation of reflectorized pavement markers. Kelsey Wuoti (520) 229-4726 kwuoti@orovalleyaz.gov LIVE: Microsoft Teams Meeting ID: 243 598 675 777 76 Passcode: ha2WE93q
PREBID
1/28/2026 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT