Access the Full Project by Clicking here!
Bidjugde
JOB
IFB Construction Montclair Force Main Improvements
BID DATE
02/19/26 - 12:00
AGENCY
Inland Empire Utilities
ESTIMATE
$9,520,000
SCOPE
Construction of approximately 4618 LF of new fusion bonded 20-inch DIPS HDPE DR13.5 force main and fittings in Philadelphia Street. Construction of approximately 282 LF of new 30-inch steel casing and installation of carrier pipe for crossing Euclid Avenue using guided horizontal auger bore and jack construction, including a jacking shaft, receiving shaft, shoring, and instrumentation. Construction of a new 72-inch “doghouse” style discharge junction manhole in Philadelphia St. Construction of a 13’ x 13’ x 13.25’ new precast concrete valve vault, with valves, piping, fittings, sump pump, grating, and electrical and instrumentation. Construction of two 18-inch motorized plug valves with 480V electric actuators connected to the existing MCC but requiring new buckets and breakers. https://vendors.planetbids.com/portal/27411/bo/bo-detail/137059 jvillalobos@ieua.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT