Access the Full Project by Clicking here!
Bidjugde
JOB
Crws Elm Fork Interceptor Rehabilitation Replacement Phase 1 Cac 8a
BID DATE
04/16/26 - 11:00
AGENCY
Trinity River Authority Texas
ESTIMATE
n/a
SCOPE
-1,480 linear feet (LF) of 66-inch to 84-inch gravity wastewater line by open-cut; -1,000 LF of 84-inch gravity wastewater line by-other-than-open-cut; -1,670 LF of 54-inch to 84-inch gravity wastewater line by open-cut; -200 LF of 66-inch gravity wastewater by-other-than-open-cut; -80 LF of 48-inch wastewater by open-cut; -200 LF of 18-inch polyvinyl chloride (PVC) Force Main; -160 LF of 8-inch HDPE Sanitary Sewer Pipe By Open-Cut (All Depths) -11 – connections to existing interceptors and points-of-entry; -17 FRP or polymer manholes; -Two – Fiberglass Junction Boxes; -Pipeline construction and earthwork across two (2) locations of creek and aerial crossings, including construction of a cofferdam and rebuilding a spillway structure; -500 LF of storm drain replacement per TxDOT standards; -50 LF of waterline relocation; -Grout filling of existing interceptors, manholes, and junction structures; -Relocation of fiber optic and underground electric lines. https://www.civcastusa.com/project/6941805195f1a7fd6691cdef/summary vossaf@trinityra.org
UPDATES