Access the Full Project by Clicking here!
Bidjugde
JOB
(JOC) Concrete Asphalt Restoration
BID DATE
01/30/26 - 10:00
AGENCY
Phoenix
ESTIMATE
n/a
SCOPE
At a minimum, the Contractor will be expected to successfully perform the following construction services, including, but not limited to: • Remove temporary asphalt patch (cold mix) and replace with permanent hot mix • Remove and replace concrete curb and gutter, sidewalk, sidewalk ramps, and driveways • Adjust utilities including manhole frames, covers, valve boxes, and survey monuments • Install ½ sack controlled low strength material or Aggregate Base Course • Work locations are citywide on arterials, collectors, local streets, and outside of the city right-of-way where City water and sewer infrastructures are present • Must provide crews dedicated solely to this project to make sure restorations are completed within 21 calendar days after street cut is made • During emergency/priority requests, restoration efforts must start the day of the request and schedule restorations the same day or the following day, depending on material availability • Other services may be required • The above scope is for emergency and non-emergency situations https://procurement.opengov.com/portal/phoenix/projects/215576
UPDATES