Access the Full Project by Clicking here!
Bidjugde
JOB
Laguna Creek Multi Functional Corridor
BID DATE
02/17/26 - 8:00
AGENCY
Elk Grove
ESTIMATE
$4,539,000
SCOPE
The proposed Project will involve construction of an approximately half-mile long multi-functional corridor parallel to and crossing Laguna Creek, located between East Stockton Boulevard and Camden Park. The multi-functional corridor will provide maintenance access to Laguna Creek and will also act as a future pedestrian and bicycle trail. The multi-functional corridor will be elevated above existing ground surface elevation by approximately 2 feet. The surface of the corridor will include a 10-foot-wide paved surface with 2-feet wide decomposed granite shoulders. Post-and-cable fencing will be installed at the edges of the unpaved shoulders. Two prefabricated steel truss bridges with concrete decks will provide necessary access across Laguna Creek. https://vendors.planetbids.com/portal/46142/bo/bo-detail/136675 kbrown@elkgrovecity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT