Access the Full Project by Clicking here!
Bidjugde
JOB
Page Mill Road Intersection Improvement El Camino Real
BID DATE
01/8/26 - 12:00
AGENCY
Santa Clara County
ESTIMATE
n/a
SCOPE
The Work consists of providing temporary traffic control system and installing temporary traffic temporary traffic detection system; supplying of labor, materials, and equipment as required for removal of channelizing island, reconstruction of raised median and raised median extension; removal of existing traffic island and installation of new curb return, sidewalk, gutter, and curb ramps; ramps; new PCC curbs, roadside signs, traffic detectors, conduit, conductors, pull boxes, traffic signal poles, traffic detection and monitoring cameras, removal and replacement of traffic stripes, pavement markings, and pavement markers; furnishing and installing traffic signs, utility coordination; installation and removal of landscaping and bioretention area, removal of existing and installation of new inlet and piping; relocation of VTA bus stop, relocation of fire hydrant, relocation of case vent pipe; coordination with Caltrans, City of Palo Alto, VTA, and other stakeholders; and performing other work not specifically mentioned above that is required by the the project plans or these Special Provisions. https://biddingousa.com/santaclaracounty/bid/1/41284411/40353528/verification

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT