SCOPE
Contracting services are required for the City of Santa Fe Project, Bishop’s Lodge Rd., Brownell-Howland Rd., Lugar De Monte Vista Water Replacement Project. The work consists of, but is not limited to complete in place installation of approximately 410-feet of 4-inch water main, 1180- feet of 6-inch water main, 2130-feet of 8-inch water main including water valves, valve boxes, fire hydrant removals with all appurtenances and road restoration, in accordance with the drawings, specifications, and other contract documents. The locations of the project are Bishop’s Lodge Road between Stagecoach Dr. and Hillcrest Dr., Brownell-Howland and Terral Rd., and Lugar de Monte Vista west of Galisteo St.. Eric Ulibarri (505) 955-4279