Access the Full Project by Clicking here!
Bidjugde
JOB
2026 Phase 1 Water Main Replacement
BID DATE
01/8/26 - 8:00
AGENCY
Bellevue
ESTIMATE
$4,916,000
SCOPE
Work contemplated to be performed under this contract is as follows: • Constructing approximately 7,100 LF of ductile iron water mains, • Installing new fire hydrant assemblies, • Installing replacement water services, • Construction dewatering, • Relocating existing utilities (as required), • Abandoning asbestos cement pipe, • Restoring surface conditions, including asphalt trench patching and concrete curbs, gutters, and sidewalks, • Performing traffic control, • Other work as required to complete the project http://bxwa.com/bxwa_toc/pub/255/blv60_2026_phase_1_water_main_37960/info.php jstockwell@bellevuewa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT