Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2024 2025 Street Rehabilitation 19th St Alder St Alley Between 2nd 4th St
BID DATE
01/8/26 - 12:00
AGENCY
Pacific Grove
ESTIMATE
n/a
SCOPE
Street rehabilitation project including storm drainage and sanitary sewer system improvements. The work consists of roadway excavation, pavement grinding, grading, preparing sub-grade, placing salvaged asphaltic grindings for re-use as base material, placing Class 2 aggregate base and asphalt concrete paving for street reconstruction and overlay; construction and/or reconstruction of curb and gutter, cross gutter, sidewalk, driveway approaches and curb ramps; storm drain improvements; sanitary sewer improvements; raising/adjusting manholes, valve boxes, and utility boxes to new finished grade; traffic striping and markings and all other work shown on the plans for the segments of 19th Street, Alder Street, and Alley between 2nd Street & 4th Street. https://www.cityofpacificgrove.gov/bid_detail_T7_R221.php sherman@neillcorp.com dgho@cityofpacificgrove.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT