Access the Full Project by Clicking here!
Bidjugde
JOB
Strathern Park North Stormwater Capture
BID DATE
01/22/26 - 12:00
AGENCY
Los Angeles
ESTIMATE
n/a
SCOPE
The project proposes to capture stormwater runoff from a 445-acre tributary area with an estimated average yield up to 225 AFY by diverting surface flows within the storm drain MTD 117 to the park. Best Management Practices (BMPs) strategically located throughout the undeveloped portion of the park are proposed to capture and store stormwater runoffs. The proposed Project consists of installing a 1.4-acre underground infiltration gallery to capture and infiltrate stormwater at Strathern Park North. Construction of the underground infiltration gallery will include installation of a diversion structure, a catch basin, storm pipes, a hydrodynamic separator, desilting basin, flow measuring devices, and educational signage. https://www.rampla.org/s/opportunity-details?id=006Ql00000WWp9t eduardo.hernandez@lacity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT