Sugarloaf Parkway Old Snellville Highway
BID DATE
01/14/26 - 12:00
AGENCY
Lawrenceville
ESTIMATE
n/a
SCOPE
This project will consist of installing approximately 350 feet of 6 inch steel, 350 feet of 4 inch PE, and 625 feet of 2 inch PE. Sugarloaf Pkwy- Install approximately 350 feet of 6 inch steel and 350 feet of 4 inch PE. Two steel main tap and stops with tie overs. Two PE main tie-overs. Will require open trenching and boring. Old Snellville Hwy- Install approximately 625 feet of 2 inch PE. One service tie-over and two main tie-overs. Will require open trenching and boring. https://www.lawrencevillega.org/bids.aspx?bidID=376 chris.duncan@lawrencevillega.org