Access the Full Project by Clicking here!
Bidjugde
JOB
NE 40th Inlet Meter Abandonment
BID DATE
12/18/25 - 8:00
AGENCY
Bellevue
ESTIMATE
$258,695
SCOPE
Constructing approximately 40 LF of 18” ductile iron watermain. Installing new 18” butterfly valve. Abandoning existing water meter and 96” manhole. Connecting to existing watermain. Asphalt trench patching, Providing traffic control and other work required to complete the project. ss='bg_grey' href='http://bxwa.com/bxwa_toc/pub/255/blv58_ne_40th_inlet_meter_aban_58835/info.php' target='_blank'>http://bxwa.com/bxwa_toc/pub/255/blv58_ne_40th_inlet_meter_aban_58835/info.php dross@bellevuewa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT