2026 Sandy City Utility
BID DATE
12/18/25 - 1:00
AGENCY
Sandy
ESTIMATE
$1,900,000
SCOPE
The work along Green Way includes the installation of approximately 930 feet of 24” diameter RCP, 230 feet of 19”x30” Elliptical RCP, 290 feet of 18” diameter RCP, and 50 feet of 15” diameter RCP; installation of junction boxes and inlet boxes; coordination with third party utilities for their relocation; removal and disposal of existing storm drain infrastructure; removal of existing waterways, regrading, and new asphalt installation. https://sandycity.ionwave.net/PublicDetail.aspx?bidID=588&SourceType=1 purchasing@sandy.utah.gov