Access the Full Project by Clicking here!
Bidjugde
JOB
100692 SW Blanton Street Improvements 209th Ave Katie Rose Terr
BID DATE
12/3/25 - 11:00
AGENCY
Washington County - OR
ESTIMATE
$7,000,000
SCOPE
https://procurement.opengov.com/portal/washington-county-or/projects/215301/document?section=2021877 kira_furby@co.washington.or.us The Work to be done under this Contract consists of the following in Washington County: Reconstruction of an existing roadway, including some full depth reconstruction and resurfacing of existing roadway. Construct asphalt and concrete driveways. Construct curbs, sidewalks and ADA ramps. Install new signing, illumination, and pavement markings Remove/abandon existing stormwater system, install new storm conveyance system and upgrade existing water quality facility Install retaining walls. Install permanent seeding and landscaping. Implement temporary traffic control and temporary erosion control measures.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT