Lift Station No 1 Force Main Replacement
BID DATE
01/21/26 - 12:00
AGENCY
Lake Jackson
ESTIMATE
n/a
SCOPE
1-New 9.25 MGD lift station. 1-18” ID circular wet well with Canopy Covering and Trolley Hoist 2-3 submersible pumps with VFDs. 3-New CMU Electrical Building 4-New Generator 5-Site Improvements, Grading, and Paving. 2-Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods. 1 -Furnish and Install thirteen (13) 2” combination air release/ vacuum valves. 2-Furnish and Install four (4) 24” direct bury plug valves. 3 -Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material. 4 -Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material. 5-Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material. 6-Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement. 1-Connection to existing headworks. 2-Demolition of existing lift station. https://www.civcastusa.com/project/691e71c9cb7fc559814c2f60/summary Melissa.Magill@freese.com
PREBID
12/9/2025 12:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT