Auds Creek 8a Dam Repair Lamar County
BID DATE
01/13/26 - 8:00
AGENCY
Lamar Soil and Water Conservation
ESTIMATE
$1,467,831
SCOPE
Auds Creek Site 8A Dam Repairs Repairs will include repairing embankment slope failures outside of the previously repaired sections, reshaping and armoring the eroded plunge basin, re-grading the unstable waterway along left downstream toe, re-grading the uneven auxiliary spillway crest section, reshaping and smoothing a portion of the eroded outside auxiliary spillway slope, replacing the deteriorated trash rack and slide gate and replacing the deteriorated fences around the embankment and spillways. https://www.civcastusa.com/project/691f4c9f7c960f09f704c33a/summary jholmes@mande-pe.com