Access the Full Project by Clicking here!
Bidjugde
JOB
Eisenhauer Northwood Devonshire Ph 1a 2022 Bond
BID DATE
01/6/26 - 12:00
AGENCY
San Antonio
ESTIMATE
$8,128,000
SCOPE
Install 10'x7' underground box culvert storm drain from end of previous trunkline phase at Albin and Pike intersection to low water crossing. Additionally, the low water crossing will be raised with a new 7'x4' box culvert installed. The existing concrete channel will be demolished and the 7'x4' box culvert storm drain will be installed in its place. Pike Rd, from approximately Albin to just past the low water crossing, will be reconstructed with new storm sewer inlets, sidewalks and driveway approaches, with other related items. SAWS water line and sewer line relocations will be included with the work. CPS gas relocation is included also. https://www.civcastusa.com/project/69209d0282f22447911c8dd2/summary melissa.ortega1@sanantonio.gov
PREBID
12/11/2025 8:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT