Sleepy Hollow Waterline Replacement Phase II (REBID)
BID DATE
10/22/15 - 2:00
AGENCY
Chino Hills
ESTIMATE
$900,000
SCOPE
ORG BID RESULTS: Borden Excavating - $797,550 Miramontes - $861,925 Cedro Construction - $950,363 Ferreira Coastal Construction - $1,230,368 The work comprises, but is not limited to: mobilization, traffic control, installation of 2,110 L.F. of 14-inch DR 11 HDPE pipe and 185 L.F. of 8-inch DR 18 fusible pipe by horizontal directional drilling methods; furnishing and installation of two-way Altitude Valve, 4 fire hydrants, 4 air-valves, 3 x 12-inch gate valves and a blow-off; construction of 4 retaining walls for air-valve and fire hydrants, relocation of 2 x 1½ water service lines. Paul Montoya, Phone (909) 364-2817, Fax (909) 364-2791; Email: pmontoya@chinohills.org.