CB26 003 Dune Crossovers South 7th Flagler Lane
BID DATE
01/2/26 - 12:00
AGENCY
Cocoa Beach
ESTIMATE
n/a
SCOPE
The scope of this project is to replace the existing ADA dune crossover at the designated site in Cocoa Beach, FL. The project entails the complete demolition and removal of the current structure, followed by the construction of a new ADA-compliant dune crossover with all necessary landings, ramps, handrails, and structural support elements. The new structure South 7th Street will span approximately 237 ft and Flagler Lane will span approximately 222 feet in length and be constructed primarily from Southern Yellow Pine timber, pressure-treated in conformance with the construction drawings for enhanced durability and resistance to coastal environmental conditions. https://www.cityofcocoabeach.com/bids.aspx?bidID=106 BKalsow@cityofcocoabeach.com
PREBID
12/12/2025 12:00