Sanitary Sewer Rehabilitation - Arlington The Alameda San Antonio
BID DATE
09/29/15 - 2:00
AGENCY
Berkeley
ESTIMATE
$1,100,000
SCOPE
The work to be done consists of, but is not limited to, the rehabilitation and construction by: a) Pipebursting (Method B) of approximately 2,346 linear feet of 8-inch diameter, 10-inch diameter, and 12-inch diameter sanitary sewer. b) Traditional Open-trench (Method C) of approximately 583 linear feet of 6-inch diameter, 8-inch diameter and 12-inch diameter sanitary sewer. Replacement of approximately 531 linear feet of 4-inch and 6-inch diameter sanitary sewer laterals. Construction and rehabilitation of manholes including excavation and related work. Tiffany Pham, Assistant Civil Engineer, at 510-981-6427 or TPham@CityofBerkeley.info.