ESTIMATE
n/a
SCOPE
Widen the existing intersection at Real Vista Drive and Mountain Corridor, including new full-depth pavement, pavement milling and overlay, curb, gutter, ADA ramps, and asphalt sidewalk. Jack and bore 70 linear feet 36” steel casing. Install 54 linear feet 18” HP Pipe. Install 348 linear feet 24” HP Pipe. Install 115 linear feet 30” HP Pipe. Install a traffic signal system. Install signing and striping. https://utah.bonfirehub.com/opportunities/210912