Access the Full Project by Clicking here!
Bidjugde
JOB
Region 5 US 160 Surface Treatment NHPP 1602-184 (24662)
BID DATE
12/18/25 - 8:00
AGENCY
CDOT
ESTIMATE
$20,000,000
SCOPE
US 160 HIGH BRIDGE TO ELMORES Limits of project are (5.55 miles) from MM 86.20, north end of High Bridge to MM 91.75, existing pavement joint east of US 160/SH 172 intersection. Surface treatment paving will also take place on Ramp A, B, C and D of the US 550/US 160 interchange. Polyurethane slab jacking at the approach to P-05-V (Ramp A) and the approach to P-05-W (Ramp C). P-05-S (High Bridge) includes removal of existing asphalt, sounding of bridge deck, Removal of Portions of Present Structure (Class 2), installation of waterproofing membrane and new asphalt material placed. Project triggers ADA required pedestrian modifications at Dominquez Dr. (Walmart), River Rd. (Home Depot), Three Springs Blvd. and SH 172/CR234 (Elmore's Corner). Project to include but not limited to HMA pavement and shouldering material, signing and striping, concrete removal and replacement at ADA locations, inlet removal and replacement along raised median, asphalt planing/milling, guardrail removal and replacement.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT