Access the Full Project by Clicking here!
Bidjugde
JOB
Water Conservation Phase 2 - Wildwood Dog Park Equestrian Center
BID DATE
09/17/15 - 10:00
AGENCY
Yucaipa
ESTIMATE
$300,000
SCOPE
1. Demo, and Clear & Grub shall include, but not be limited to, all necessary labor, equipment, material and associated appurtenances to place or install according to the plans and specifications: clear and grub site, removal of existing turf and unclassified material, construction water, utilities, etc. 2. Grading & Drainage shall include, but not be limited to, all necessary labor, equipment, material and Associated appurtenances to remove or place or install according to the plans and specifications: fine grade site, to obtain final grade (available on-site) 1 Yi" below adjacent hardscape. 3. Hardscaping shall include, but not be limited to, all necessary labor, equipment, material and associated appurtenances to place or install according to the plans and specifications: decomposed granite ground cover, 4" deep after compaction over compacted native soil. Decomposed Granite shall be installed per City Standard detail 600-0 4. Planting shall include, but not be Limited to, all necessary labor, equipment, material and associated appurtenances to place or install according to the plans and specifications: all planting areas with appropriate amendments, perform weed abatement measures, purchase, ship, and install all plant material per specifications, install root barriers, install staking poles and related materials, and maintain all planting and irrigation for the plant establishment period. Plants will be spotted out prior to planting by City Landscape Architect. Specific plants are listed per site, within these specifications. 5. Irrigation shall include, but not be limited to, all necessary labor, equipment, material and associated appurtenances to place or install according to the plans and specifications: all irrigation related products per specifications. This would include all piping, valves, filters, regulators, valve boxes, drippers, drip line, controller assembly, miscellaneous fittings and wiling. Lorrie Hutchison City of Yucaipa Public Works 34272 Yucaipa Blvd Yucaipa, CA 92399 Tel:(909) 797-2489 Fax:(909) 500-7845 lhutchison@yucaipa.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT