Access the Full Project by Clicking here!
Bidjugde
JOB
Trans Mains 1 2 Valve Replacement Phase 3 Rebid
BID DATE
12/2/25 - 7:00
AGENCY
Snohomish County
ESTIMATE
$1
SCOPE
Installation of one (1) 16-inch butterfly valve, one (1) 24-inch butterfly valve, three (3) 30- inch District supplied butterfly valves with appurtenances. Installation of one (1) 30-inch by 16-inch tee, two (2) 30-inch by 24-inch tees and one (1) precast concrete access vault with appurtenances for pipe access. Removal and replacement of approximately 50 linear feet of 12-inch diameter DI water main with 16-inch diameter water main, including replacement of two (2) 12-inch diameter gate valves, fittings, appurtenances, and installation two (2) new 12-inch insertion valves at one site location. Removal and replacement of impacted storm drain at Site 3-06B. Removal, hauling, and disposal of existing transmission main piping, water main piping, valves, appurtenances. Roadway and property restoration, site cleanup, and temporary traffic control. http://bxwa.com/bxwa_toc/pub/46/aw37_trans_mains_1_amp_2_valve_31224/info.php ZPurtill@awwd.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT