Access the Full Project by Clicking here!
Bidjugde
JOB
2023 Falls City Cdbg Main Water Line Replacement
BID DATE
12/2/25 - 8:30
AGENCY
Falls City
ESTIMATE
n/a
SCOPE
1. Replacing and installing new 6” PVC main line on Gilbert St.from N. Pecan St. to past N. HopkinsSt., N. Hopkins St.,Terrell St. from N. Hopkins St. to N Nelson St., N. Nelson St. from W. Cooper St. to Terrell St., W. Cooper St. form N. Hopkins St. to W. Irvin St. 2. When all tests are accepted, the existing water services along these new lines will be connected to the new main line. 3. The existing fire hydrants will be connected to the new main line as well. https://www.civcastusa.com/project/690d21f9539657830bf676b9/summary dmcada@rak-eng.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT