Access the Full Project by Clicking here!
Bidjugde
JOB
C0714 Almaden Valley Pipeline Replacement Phase 1
BID DATE
12/17/25 - 12:00
AGENCY
Santa Clara Valley WD
ESTIMATE
$60,000,000
SCOPE
Furnish, deliver, install, and test approximately 19,000 linear feet of 78” diameter split-can steel pipeline liners and associated appurtenances to replace a segment of the existing Almaden Valley Pipeline. Drain and remove water from Almaden Valley Pipeline as shown on the Drawings. Design and install excavation shoring to allow demolition of 78” PCCP, the installation of new pipeline liners, and the demolition and reconstruction of Shannon Line Valve. Perform excavation at each identified pipeline access sites along Almaden Valley Pipeline as shown on the Drawings. https://vendors.planetbids.com/portal/48397/bo/bo-detail/131851 lgregory@valleywater.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT