2023 Street Bond Package 3
BID DATE
12/2/25 - 12:00
AGENCY
Angleton
ESTIMATE
$3,001,803
SCOPE
The project generally consists of removing existing pavement along North Parrish Street and replacing with approximately 5,500 SY of 7"-think , 28' wide concrete pavement, replacing driveways, curbs, installation of storm sewer inlets and the installation of approximately 2,520 L. F. of 18" to 30" RCP storm sewer along North Parrish Street. This project also includes mill, base repair, and overlay of the existing asphalt pavement along Silver Saddle Dr. and proposed ditch regrading in certain segments. https://www.civcastusa.com/project/690ce0644da7d115e9f4c1c8/summary john.peterson@hdrinc.com