Access the Full Project by Clicking here!
Bidjugde
JOB
Loop 121 Utility Relocations From I 14 I 35
BID DATE
12/16/25 - 12:00
AGENCY
Belton
ESTIMATE
$1,720,000
SCOPE
This project consist of approximately 15 LF of 6-inch PVC waterline, 595 LF 8-inch PVC waterline, 330 LF 12-inch PVC waterline, 2,690 LF of 14-inch PVC waterline, 6 LF of 16-inch HDPE encasement by Open Cut, 12 LF of 24-inch HDPE encasement by Open Cut, 260 LF of 24-inch Steel Encasement by Open Cut, 215 LF 24-inch Steel Encasement by Bore, Five Standard Fire Hydrant Assemblies, Two Parallel Fire Hydrant Assemblies, and the abandonment of 6-inch, 8-inch, 12-inch, and 14-inch piping in place with concrete slurry. https://www.civcastusa.com/project/6908bab216415747db9d8096/summary rkasberg@kpaengineers.com
PREBID
11/12/2025 12:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT