Access the Full Project by Clicking here!
Bidjugde
JOB
Sunset Hwy US2 Bicycle Facilities Shared Use Path
BID DATE
11/24/25 - 11:00
AGENCY
Spokane
ESTIMATE
n/a
SCOPE
This project consists of the construction of approximately 10,000 linear feet of HMA shared use path (12,000 square yards of 3-inch thick HMA and 4-inch thick CSTC), 2700 cubic yards of excavation and embankment, 200 linear feet of storm sewer, 4 drainage structures, 1 20-ft long contractor designed buried structure, 350 linear feet of absorption trench, 400 linear feet of gravity block wall (2.5-4.0 feet tall), 1 pedestrian hybrid beacon system, 100 linear feet of sidewalk, 400 linear feet of cement concrete curb, sundry utility adjustments, and other related miscellaneous items. https://my.spokanecity.org/business/bid-and-design/current-projects/ engineeringadmin@spokanecity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT