Access the Full Project by Clicking here!
Bidjugde
JOB
2026 Street Resurfacing
BID DATE
12/18/25 - 12:00
AGENCY
Palm Coast
ESTIMATE
n/a
SCOPE
The City of Palm Coast intends to request bids for Milling & Resurfacing of the arterial roadway Palm Coast Pkwy. from I-95 east to the Hammock Dunes Toll Bridge. To include the side streets in between Palm Coast Pkwy. WB & Palm Coast Pkwy EB. Listed as; Harbor Center Way, Florida Park Dr., Clubhouse Dr., Colbert Ln. & Fairways Cir. This will include milling 1.5 inches of asphalt and replacing with 1.5 inches of asphalt to include, striping and utility valve/ manhole adjustments. Arterial roadway work may include areas of base repair, utilizing deep milling up to 8 inches and replacement of base material with asphalt. https://palmcoastgov.bonfirehub.com/opportunities/207074
PREBID
11/20/2025 9:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT