Access the Full Project by Clicking here!
Bidjugde
JOB
Crosstown Connector Construction Phase 2
BID DATE
12/11/25 - 12:00
AGENCY
Destin
ESTIMATE
n/a
SCOPE
To construct the Crosstown Connector project in 2 phases due to timing of availability of construction funding. When completed, the Crosstown Connector will be a new 0.42-mile two-lane east-to-west roadway corridor that will provide an alternative route to US 98 for local traffic. The new roadway corridor will connect Azalea Drive at the Benning Drive intersection to Legion Drive at the Beach Drive intersection. Phase 1 constructed the underground stormwater retention system (ADS Chambers), several segments of stormwater pipe, and several drainage structures. Phase 2 will construct the remainder of the project and will tie into the elements constructed in Phase 1. https://www.cityofdestin.com/bids.aspx?bidID=180 cityclerk@cityofdestin.com
PREBID
11/18/2025 12:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT